Wiring accomplished. Double outlets beside the bed (matching ones on the other side.) I'm very happy with the quality of the wiring in the house.
In the bathroom, you can see the thick blue data wires heading to the basement where the wiring will all be connected.
Here's that same wall in the Kitchen below, where demolition began on Monday (July 25th). All the upper cupboards removed, and the lathe and plaster off about half of the wall space.
These two shots show the completed outside walls. The wall with the sink will be completely removed as this is where the addition will be attached. The sink is moving under the window on the upper picture. (Or that's the plan for now...) The ceiling comes down next.
No comments:
Post a Comment