We're overdue for an update, so I thought I'd put my tired fingers to use and post.
The roof is now about half way done. It would have been a lot further, but some of the workers elected not to show up today, much to the chagrin of the contractor... From this view, it looks great. (Although after this was taken, the chimney was removed as well.
The other side doesn't look as good. Assuming we have a full crew tomorrow, they'll make good progress however. This has been a hard roof for them to do.
Last night, we removed the last wall of plaster in the bedroom. We are (laughingly) thinking of calling it either the Jonathon or Nichole memorial wall, as they both suggested (correctly so) that we remove it as now was the time.
The kitchen is pretty much ready to go. We took down the tile ceiling and hope to simply put wallboard up on the same strips. Should work fine. The only wall we left alone is the back wall which will be coming completely out.
That leaves the basement, which no longer has a mold filled shower, just a mold covered corner that will be cleaned up as soon as we can hook up the utility sink and shut down the other plumbing that has to come out.
Since these were taken, the chimney has come all the way out of the bedroom, which makes a tremendous difference in perceived space. We'll get some more pictures of the new roof-line and the inside of the bedroom soon. The bathtub and surround have arrived. Work on that is beginning again. Once the roof is done, the only demolition left will be the back porch and wall, along with the chimney through the dining room and into the basement. Then it's on to making all things new!