The back porch has been removed, the foundation dug, and today, the footing and walls are poured.
Meanwhile, upstairs, we continue to work on the bathroom. The tub is in, and the shower surround is going up. The chimney is gone from this level. Still work to do to move it out of the main and basement levels.
Speaking of the main level, I finally got around to getting the kitchen sink and drain taken care of.
In order to do that I had to finish dismantling the downstairs shower area. This should make the plumbing that much easier for the new addition, as well as open up the basement for better storage. Now to finish the cleanup, and get the utility sink installed. That will let us wash down the walls and get rid of the mold for good.