Monday, October 17, 2011

From floors to ceilings & walls

After a bit of a pause (lots of stuff happening in the background) visual changes are beginning again at 414 Main with more to come this week.   The flooring is down in the kitchen, new bedroom, and new bathroom.  The vanity, vanity light, sink, and toilet are ready to be installed in the new bathroom.  The doors and trim are ready for the addition.   All the kitchen cupboards are ready and waiting to be installed. (That was supposed to start today, but hopefully will start tomorrow.)  Appliances are ready to be delivered and installed later this week (assuming we are ready for them.)  The freezer has been moved from basement to basement.   We've had insulation blown in all walls that we couldn't get to to insulate in any other way.   Those holes are now filled.
Carport.
Kitchen Flooring is down and ready for cabinets.
New Bedroom floor is down (Thanks Jonathon!)

Meanwhile, upstairs, the master bedroom walls and ceilings have been finished.  They are now painted but these pictures were taken with only the primer on.   I ran out of non-tinted primer and finished with some pink.   People asked me about an accent wall.  Don't worry, it didn't happen.  Ceiling is white, and the walls are "Poetic Justice" aka beige.




Now we are ready for a return trip from Electricians, plumbers, and general contractor.  If they get back this week, we'll have a kitchen that works, a usable bedroom, and two fully functional bathrooms (one that will even have a door!)  Now if the LP people will just set and hookup the LP tank, we could actually have a furnace and (soon) a gas stove that work as well.

No comments: